Big Easy Flooring, New Orleans
Commercial Sector

Parking Garage Flooring in New Orleans

At Big Easy Flooring we coat and finish parking garage decks across New Orleans and the surrounding parishes. Contact us and we will walk the space, measure it and price the work.

  • FreeOn-site measure
  • WrittenQuote, not a phone guess
  • 100%Satisfaction guarantee
  • Mon to Fri8 AM to 6 PM
Overview

What a Deck Has to Survive

Tires arrive hot, vehicles leak oil, and water comes in on every car during a Louisiana downpour. A garage deck needs a system that bonds into the slab and does not care about any of that.

It also has to take point loads from jacks and racking, and survive the cleaning regime, which in a garage usually means a machine rather than a mop.

Open utility floor, bare concrete slab
What We Lay Here

Which Flooring Systems Suit Parking Garages?

Deck systems, and where each one belongs. Ramps and flat decks are not the same surface problem.

In Detail

Ramps Are the Risk

A flat deck and a ramp are not the same surface problem. A ramp that is wet and smooth is dangerous, and it is the part of a garage most likely to generate a claim.

Non-slip finishes on ramps and turning areas are worth specifying deliberately rather than leaving to whatever the field coating happens to do.

The same goes for the pedestrian route. Where people walk across a deck, that line deserves its own thought.

What Matters

What Matters on a Parking Garage Job

01

Preparation Decides Whether It Lasts

Deck coatings fail at the bond. Grinding the slab and testing it for moisture is what makes the bond hold.

Skipping it buys a floor that looks finished on handover and lifts in sheets within a season, usually starting where the traffic turns.

Existing coatings have to be dealt with rather than covered. A new system over a failing old one fails at the same rate.

02

Working While the Garage Stays Open

Most garages cannot close, so the work is phased bay by bay or level by level, with the sequence agreed before anything is ground.

Cure times drive that sequence. A bay that needs forty-eight hours before a car goes on it has to be planned for, not discovered.

Line marking and bay layout are part of the same visit rather than a separate trade turning up afterwards.

Pricing

What Changes the Price

A parking garage job prices on access and program as much as on area.

We will not quote a rate over the phone, because a rate without a measure is a guess with a number on it. We come out, measure, test what needs testing and put it in writing.

  1. 01The area, and how much of it can be released at once
  2. 02Whether the building stays open, and which routes stay live
  3. 03The substrate, and what a moisture test says about it
  4. 04Out-of-hours or phased working, which is priced from the start
  5. 05Coving, drainage falls and transition detailing
  6. 06Removing and disposing of the existing floor
Other Sectors

Where Else Do We Work?

Questions

Questions About Parking Garage Flooring

Can you coat an existing deck?

Usually, depending what is already on it and how the moisture test reads.

Do you do line marking?

Yes, bay layout and marking are part of the work.

What about the ramp?

It gets a non-slip finish. A smooth ramp in the wet is a hazard.

Can it be done in sections?

Yes. Most garages have to stay partly open, so phasing is normal.

How long before cars can drive on it?

Longer than people can walk on it. The exact figure comes with the system and is in the program.

What if the old coating is lifting?

It comes off first. Coating over a failing system just buys the same failure again.

Free Estimate

Want a Price for Your Parking Garage?

A free on-site visit, a written quote, and a schedule built around the hours you actually have. Monday to Friday, 8 AM to 6 PM.

Call (504) 305-8727Send us the details

Free estimate
Get a free estimate
Free Estimate

Tell Us About the Floor

Fill this in and we will be in touch to book the free on-site measure. Rather talk? Call (504) 305-8727.